BLOOMFIELD BRIDGE (TIP)
Pages 31–32 in Capital Budget · 2tables · includes narrative
BLOOMFIELD BRIDGE (TIP)
Functional Area: Engineering and Construction Project Type: Continuing, Capital Project Responsible Department: DEPARTMENT OF MOBILITY AND INFRASTRUCTURE Project Manager: Deputy Director, Mobility & Infrastructure
Capital Improvement Program
Project Description
Rehabilitation of the Bloomfield Bridge over active railroad tracks and the busway.
Project Justification
A recent inspection of the bridge revealed that the structure is in need of several repairs. Rehabilitation of the bridge is necessary to avoid further potential issues down the line and impact the bridge's lifespan.
Shows capital project funding by source and year.
Operating Budget Impact
Staff time will be needed to manage vendor contracts and review plans. The project will result in a rehabilitated bridge that will provide operational maintenance savings.
Unexpended/Unencumbered Prior Year Funds $375,738
BLOOMFIELD BRIDGE (TIP)
2027 Deliverables and Objectives
Deliverables are tentative and subject to change Location

Lists project objectives, deliverables, and performance measures.
| Deliverable/Objective | Location | District | Fund | Cost |
|---|---|---|---|---|
| BLOOMFIELD BRIDGE - FINAL DESIGN (TIP) | Bloomfield Bridge | District 7 | OTHER | 800,000 |